Revisión de la literatura sobre la flexibilidad de decisión operacional.
Submitted: 2011-02-17
|Accepted: 2011-06-09
|Published: 2011-06-09
Downloads
Keywords:
Flexibilidad, Cadena de Suministro, Planificación de las Operaciones, Estado del arte
Supporting agencies:
Julien Maheut is sponsored by a Val I D grant from the Generalitat Valenciana.
Abstract:
References:
Aissaoui, N.; Haouari, M.; Hassini, E. (2007). Supplier Selection and order lot sizing modeling: a review. Computers & Operations Research, Vol. 34, nº. 12, pp. 3516-3540.
Akkerman, R.; van Donk, D. P. (2009). Product mix variability with correlated demand in two-stage food manufacturing with intermediate storage. International Journal of Production Economics, Vol. 121, nº. 2, pp. 313-322.
Arunapuram, S.; Mathur, K.; Solow, D. (2003). Vehicle Routing and Scheduling with Full Truckloads. Transportation Science, Vol. 37, nº. 2, pp. 170-182.
Balakrishnan, A.; Geunes, J. (2000). Requirements Planning with Substitutions: Exploiting Bill-of-Materials Flexibility in Production Planning. Manufacturing Service Operations Management, Vol. 2, nº. 2, pp. 166-185.
Bilgen, B.; Günther, H. O. (2009). Integrated production and distribution planning in the fast moving consumer goods industry: a block planning application. OR Spectrum.
Calderon-Lama, J. L.; Garcia-Sabater, J. P.; Lario, F. C. (2009). Modelo para la planificación de Operaciones en Cadenas de Suministro de Productos de Innovación. DYNA Ingeniería e Industria, Vol. 84, nº. 6, pp. 517-526.
Caner TaskIn, Z.; Tamer Ünal, A. (2009). Tactical level planning in float glass manufacturing with co-production, random yields and substitutable products. European Journal of Operational Research, Vol. 199, nº. 1, pp. 252-261.
Carrillo, J. E.; Franza, R. M. (2006). Investing in product development and production capabilities: The crucial linkage between time-to-market and ramp-up time. European Journal of Operational Research, Vol. 171, nº. 2, pp. 536-556.
Carvalho, J. D. A.; Moreira, N. A.; Pires, L. C. M. (2005). Autonomous Production Systems in virtual enterprises. International Journal of Computer Integrated Manufacturing, Vol. 18, nº. 5, pp. 357-366.
Clement, J.; Coldrick, A.; Sari, J. (1995). Manufacturing data structures: building foundations for excellence with bills of materials and process information. Wiley.
Crama, Y., Pochet, Y., & Wera, R. (2001). Production planning aproaches in the process industry. UCL, Belgium.
David, F.; Pierreval, H.; Caux, C. (2006). Advanced planning and scheduling systems in aluminium conversion industry. International Journal of Computer Integrated Manufacturing, Vol. 19, nº. 7, pp. 705-715.
de Kok, T. G.; Fransoo, J. C. (2003). Planning Supply Chain Operations: Definition and Comparison of Planning Concepts, en S. C. Graves (dir), Handbooks in Operations Research and Management Science Supply Chain Management: Design, Coordination and Operation, pp. 597-675. Elsevier.
Deuermeyer, B. L.; Pierskalla, W. P. (1978). A by-product production system with an alternative. Management Science, Vol. 24, nº. 13, pp. 1373-1383.
Escudero, L. F. (1994). CMIT, capacitated multi-level implosion tool. European Journal of Operational Research, Vol. 76, nº. 3, pp. 511-528.
Garcia-Sabater, J. P., Maheut, J., & Garcia-Sabater, J. J. (2009a). A Capacited Material Requierements Planning Model considering Delivery Constraints, in 3rd International Conference on Industrial Engineering and Industrial Management, pp. 793-803.
Garcia-Sabater, J. P., Maheut, J., & Garcia-Sabater, J. J. (2009b). A Capacited Material Requierements Planning Model considering Delivery Constraints: A Case Study from the Automotive Industry, in 39th International Conference on Computers & Industrial Engineering, pp. 378-383.
Geunes, J. (2003). Solving large-scale requirements planning problems with component substitution options. Computers & Industrial Engineering, Vol. 44, nº. 3, pp. 475-491.
Gronalt, M.; Hartl, R. F.; Reimann, M. (2003). New savings based algorithms for time constrained pickup and delivery of full truckloads. European Journal of Operational Research, Vol. 151, nº. 3, pp. 520-535.
Gupta, S. M.; Taleb, K. N. (1994). Scheduling Diassembly. International Journal of Production Research, Vol. 32, nº. 8, pp. 1857-1866.
Hachicha, W.; Masmoudi, F.; Haddar, M. (2008). A
Taguchi method application for the part routing selection in generalised group technology. International Journal of Materials and Structural Integrity, Vol. 2, nº. 4, pp. 396-406.
Hachicha, W.; Masmoudi, F.; Haddar, M. (2009). Design of experiments and analysis of correlations for the resolution of the problem of cell formation with alternative lines. Mecanique et Industries, Vol. 10, nº. 5, pp. 337-350.
Inderfurth, K.; Langella, I. (2006). Heuristics for solving disassemble-to-order problems with stochastic yields. OR Spectrum, Vol. 28, nº. 1, pp. 73-99.
Lang, J.; Domschke, W. (2010). Efficient reformulations for dynamic lot-sizing problems with product substitution. OR Spectrum, Vol. 32, nº. 2, pp. 263-291.
Lin, J. T.; Chen, T. L.; Lin, Y. T. (2009). Critical material planning for TFT-LCD production industry. International Journal of Production Economics, Vol. 122, nº. 2, pp. 639-655.
Lyon, P.; Milne, R. J.; Orzell, R.; Rice, R. (2001). Matching Assets with Demand in Supply-Chain Management at IBM Microelectronics. Interfaces, Vol. 31, nº. 1, pp. 108-124.
Matta, A.; Tomasella, M.; Valente, A. (2007). Impact of ramp-up on the optimal capacity-related reconfiguration policy. International Journal of Flexible Manufacturing Systems, Vol. 19, nº. 3, pp. 173-194.
Nilsson, C. H.; Nordahl, H. (1995). Making manufacturing flexibility operational-part 1: a framework. Integrated Manufacturing Systems, Vol. 6, nº. 1, pp. 5-11.
Öner, S.; Bilgiç, T. (2008). Economic lot scheduling with uncontrolled co-production. European Journal of Operational Research, Vol. 188, nº. 3, pp. 793-810.
Pantelides, C. C. (1994). Unified Frameworks for the Optimal Process Planning and Scheduling, in 2nd Conference on the Foundations of Computer Aided Operations, Cache Publications, pp. 253-274.
Persona, A.; Battini, D.; Manzini, R.; Pareschi, A. (2007). Optimal safety stock levels of subassemblies and manufacturing components. International Journal of Production Economics, Vol. 110, nº. 1-2, pp. 147-159.
Pires, L. C. M.; Carvalho, J. D. A.; Moreira, N. A. (2008). The role of Bill of Materials and Movements (BOMM) in the virtual enterprises environment. International Journal of Production Research, Vol. 46, nº. 4, pp. 1163-1185.
Puig-Bernabeu, X., Maheut, J., Garcia-Sabater, J. P., & Lario, F. C. (2010). Algorithm for planning the supply of products with FTL strategy in a lean environment: an industrial case, in ICOVACs 2010 - International Conference on Value Chain Sustainability, pp. 174-182.
Ram, B.; Naghshineh-Pour, M. R.; Xuefeng, Y. (2006). Material requirements planning with flexible bills-of-material. International Journal of Production Research, Vol. 44, nº. 2, pp. 399-415.
Sabri, E. H.; Beamon, B. M. (2000). A multi-objective approach to simultaneous strategic and operational planning in supply chain design. Omega, Vol. 28, nº. 5, pp. 581-598.
Schutz, P.; Tomasgard, A.; Ahmed, S. (2009). Supply chain design under uncertainty using sample average approximation and dual decomposition. European Journal of Operational Research, Vol. 199, nº. 2, pp. 409-419.
Segerstedt, A. (1996). A capacity-constrained multi-level inventory and production control problem. International Journal of Production Economics, Vol. 45, nº. 1-3, pp. 449-461.
Soman, C. A.; van Donk, D. P.; Gaalman, G. J. C. (2007). Capacitated planning and scheduling for combined make-to-order and make-to-stock production in the food industry: An illustrative case study. International Journal of Production Economics, Vol. 108, nº. 1-2, pp. 191-199.
Sousa, R.; Shah, N.; Papageorgiou, L. G. (2008). Supply chain design and multilevel planning--An industrial case. Computers & Chemical Engineering, Vol. 32, nº. 11, pp. 2643-2663.
Spengler, T.; Püchert, H.; Penkuhn, T.; Rentz, O. (1997). Environmental integrated production and recycling management. European Journal of Operational Research, Vol. 97, nº. 2, pp. 308-326.
Stadtler, H. (2005). Supply chain management and advanced planning--basics, overview and challenges. European Journal of Operational Research, Vol. 163, nº. 3, pp. 575-588.
Stadtler, H.; Kilger, C. (2002). Supply Chain Management and Advanced Planning: Concepts, Models, Software and Case Studies. springer.
Tagaras, G. (1999). Pooling in multi-location periodic inventory distribution systems. Omega, Vol. 27, pp. 39-59.
Vidal-Carreras, P.; Garcia-Sabater, J. P. (2009). Comparison of heuristics for an economic lot scheduling problem with deliberated coproduction. Journal of Marketing Research, Vol. 2, nº. 3, pp. 437-463.
Weidema, B. P. (1999). System expansions to handle co-products of renewable materials, pp. 45-48.
Wilson, S.; Platts, K. (2010). How do companies achieve mix flexibility? International Journal of Operations & Production Management, Vol. 30, nº. 9, pp. 978-1003.


