Coupling order release methods with autonomous control methods – an assessment of potentials by literature review and discrete event simulation
Abstract
Keywords
References
Armbruster, D., de Beer, C., Freitag, M., Jagalski, T., & Ringhofer, C. (2006). Autonomous control of production networks using a pheromone approach. Physica A: Statistical Mechanics and its Applications, 363(1), 104-114. doi:10.1016/j.physa.2006.01.052
Barenji, V. T., Barenji, A. V., & Hashemipour, M. (2014). A multi-agent RFID-enabled distributed control system for a flexible manufacturing shop. The International Journal of Advanced Manufacturing Technology, 71, 1773-1791. doi: 10.1007/s00170-013-5597-2
Baykasoğlu, A., & Göçken, M. (2011). A simulation based approach to analyse the effects of job release on the per-formance of a multi-stage job-shop with processing flexibility. International Journal of Production Research, 49(2), 585-610. doi: 10.1080/00207540903479778
Bechte, W. (1980). Steuerung der Durchlaufzeit durch belastungsorientierte Auftragsfreigabe bei Werkstattfertigung. (doctoral dissertation). Universität Hannover, Hanover, Germany.
Bergamaschi, D., Cigolini, R., Perona, A., & Portioli, A. (1997). Order review and release strategies in a job shop environment: A review and classification. International Journal of Production Research, 35(2), 399-420. doi: 10.1080/002075497195821
Byeon, E. S., Wu, S. D., & Storer, R. H. (1998). Decomposition heuristics for robust job-shop scheduling. IEEE Transactions on Robotics and Automation, 14(2), 303-313. doi: 10.1109/70.681248
Cicirello, V., & Smith, S. (2001). Ant colony control for autonomous decentralized shop floor routing. Proceedings of the ISADS-2001 Fifth International symposium on Autonomous Decentralized Systems, Dallas, USA: I.E.E.E.Press.
de Beer, C. (2008). Untersuchung der Dynamik von selbststeuernden Prozessen in produktionslogistischen Systemen anhand ereignisdiskreter Simulationsmodelle. (doctoral dissertation). Universität Bremen, Bremen, Germany.
Duffie, N. A., Roy, D., & Shi, L. (2008). Dynamic modeling of production networks of autonomous work systems with local capacity control. CIRP Annals - Manufacturing Technology, 57(1), 463-466. doi: 10.1016/j.cirp.2008.03.018
Duffie, N. A., & Shi, L. (2009). Maintaining constant WIP-regulation dynamics in production networks with auton-omous work systems. CIRP Annals - Manufacturing Technology, 58(1), 399-402. doi: 10.1016/j.cirp.2009.03.012
Fernandes, N. O., & Carmo-Silva, S. (2006). Generic POLCA—A production and materials flow control mechanism for quick response manufacturing. International Journal of Production Economics, 104, 74-84. doi: 10.1016/j.ijpe.2005.07.003
Fernandes, N. O., & Carmo-Silva, S. (2011). Order release in a workload controlled flow-shop with sequence-dependent set-up times. International Journal of Production Research, 49(8), 2443-2454. doi: 10.1080/00207541003720376
Freitag, M., Herzog, O., & Scholz-Reiter, B. (2004). Selbststeuerung logistischer Prozesse - Ein Paradigmenwechsel und seine Grenzen. Industrie Management, 20(1), 23-27.
Gan, H., & Wirth, A. (2005). Comparing deterministic, robust and online scheduling using entropy. International Journal of Production Research, 43(10), 2113-2134. doi: 10.1080/00207540412331333405
Gentile, F., & Rogers, K. J. (2009). Order release and dispatching in a sequence dependent job shop. Management of Engineering & Technology PICMET 2009, 1185-1196. doi: 10.1109/PICMET.2009.5262014
Gierth, A. (2009). Beurteilung der Selbststeuerung logistischer Prozesse in der Werkstattfertigung. (doctoral disserta-tion). RWTH Aachen, Aachen, Germany.
Irastorza, J., & Deane, R. (1974). A loading and balancing methodology for job-shop control. AIIE Transactions, 6(4), 302-307. doi: 10.1080/05695557408974968
Jendralski, J. (1978). Kapazitätsterminierung zur Bestandsregelung in der Werkstattfertigung. (doctoral dissertation). Technische Universität Hannover, Hanover, Germany.
Kim, J.-H., & Duffie, N. A. (2004). Backlog control for a closed loop PPC system. Annals of the CIRP, 53(1), 357-360. doi: 10.1016/S0007-8506(07)60716-1
Kornienko, S., Kornienko, O., & Priese, J. (2004). Application of multi-agent planning to the assignment problem. Computers in Industry, 54(3), 273-290. doi: 10.1016/j.compind.2003.11.002
Kurbel, K. (2005). Produktionsplanung und -steuerung im Enterprise Resource Planning und Supply Chain Man-agement. Munich, Germany: Oldenbourg.
Land, M., Stevenson, M., Thürer, M. (2012). Integrating load-based order release and priority dispatching. Interna-tional Journal of Production Research, 52(4), 1059-1073. doi: 10.1080/00207543.2013.836614
Lawrence, S. R., & Sewell, S. E. (1997). Heuristic, optimal, static and dynamic schedules when processing times are uncertain. Journal of Operations Management, 15(1), 71-82. doi: 10.1016/S0272-6963(96)00090-3
Leisten, R. (1996). Iterative Aggregation und mehrstufige Entscheidungsmodelle. Einordnung in den planerischen Kontext, Analyse anhand der Modelle der linearen Programmierung und Darstellung am Anwendungsbeispiel der hierarchischen Produktionsplanung. Heidelberg: Physica.
Leitão, P., & Restivo, F. J. (2008). Implementation of a Holonic Control System in a Flexible Manufacturing System. IEEE Transactions on Systems, Man, and Cybernetics, 38(5), 699-709. doi: 10.1109/TSMCC.2008.923881
Lödding, H. (2001). Dezentrale bestandsorientierte Fertigungsregelung. (doctoral dissertation). Universität Hannover, Hanover, Germany.
Lödding, H. (2013). Handbook of manufacturing control. Fundamentals, description, configuration. Berlin, Germany: Springer. doi: 10.1007/978-3-642-24458-2
Luczak, H., & Eversheim, W. (1999). Produktionsplanung und -steuerung. Grundlagen, Gestaltung und Konzepte. Berlin, Germany: Springer.
Melnyk, S. A., & Ragatz, G. L. (1989). Order review/release: Research issues and perspectives. International Journal of Production Research, 27(7), 1081-1096. doi: 10.1080/00207548908942609
Nyhuis, P., & Wiendahl, H. -P. (2008). Fundamentals of production logistics: Theory, tools and applications. Berlin, Germany: Springer.
O’Donovan, R., Uzsoy, R., & McKay, K. N. (1999). Predictable scheduling of a single machine with breakdowns and sensitive jobs. International Journal of Production Research, 37(18), 4217-4233. doi: 10.1080/002075499189745
Ostgathe, M. (2012). System zur produktbasierten Steuerung von Abläufen in der auftragsbezogenen Fertigung und Montage. (doctoral dissertation). Technische Universität München, München, Germany.
Owliya M., Saadat, M., Anane, R., & Goharian, M. (2012). A New Agents-Based Model for Dynamic Job Allocation in Manufacturing Shopfloors. IEEE Systems Journal, 6(2), 353-361. doi: 10.1109/JSYST.2012.2188435
Pach, C., Bekrar, A., Zbib, N., Sallez,Y., & Trentesaux, D. (2012). An effective potential field approach to FMS holonic heterarchical control. Control Engineering Practice, 20(12), 1293-1309. doi: 10.1016/j.conengprac.2012.07.005
Pannequin, R., Morel, G., & Thomas, A. (2009). The performance of product-driven manufacturing control: An emulation-based benchmarking study. Computers in Industry, 60(3), 195-203. doi: 10.1016/j.compind.2008.12.007
Park, H.-S., & Tran, N.-H. (2012). An autonomous manufacturing system based on swarm of cognitive agents. Journal of Manufacturing Systems, 31(3), 337-348. doi: 10.1016/j.jmsy.2012.05.002
Pinedo, M. L. (2008). Scheduling. theory, algorithms and systems. New York, USA: Springer.
Qi, C., Sivakumar, A. I., & Gershwin, S. B. (2009). An efficient new job release control methodology. International Journal of Production Research, 47(3), 703-731. doi: 10.1080/00207540701455335
Reaidy, J., Massotte, P., & Diep, D. (2006). Comparison of negotiation protocols in dynamic agent-based manufac-turing systems. International Journal of Production Economics, 99, 117-130. doi: 10.1016/j.ijpe.2004.12.011
Rekersbrink, H. (2012). Methoden zum selbststeuernden Routing autonomer logistischer Objekte. (doctoral disserta-tion). Universität Bremen, Bremen, Germany.
Sabuncuoglu, I., & Karabuk, S. (1999). Rescheduling frequency in an FMS with uncertain processing times and unreliable machines. Journal of Manufacturing Systems, 18(4), 268-283. doi: 10.1016/S0278-6125(00)86630-3
Sabuncuoglu, I., & Karapinar, H. (1999). Analysis of order review/release problems in production systems. Interna-tional Journal of Production Economics, 62(3), 259-279. doi: 10.1016/S0925-5273(98)00248-5
Schmidt, M., Fronia, P., Fisser, F., & Nyhuis, P. (2007). Decentralized planning and control for assembly areas driven by gentelligent® parts. Industrial Engineering and Engineering Management 2007 IEEE, 1088-1092. doi: 10.1109/IEEM.2007.4419360
Scholz-Reiter, B., Harjes, F., Mansfeld, J., & Stasch, O. (2011). An inventory and capacity-oriented production control concept for the shop floor based on artificial neural networks. Proceedings of the 7th International Conference on Digital Enterprise Technology 2011 (DET 2011), 213-220. Athens, Greece: n.p.
Scholz-Reiter, B., Görges, M., Jagalski, T., & Naujok, L. (2010a). Modelling and analysis of an autonomous control method based on bacterial chemotaxis. Proceedings of the 43rd CIRP International Conference on Manufacturing Systems 2010 (ICMS 2010), 699-706. Wien, Austria: Neuer Wissenschaftlicher Verlag.
Scholz-Reiter, B., Dashkovskiy, S., Görges, M., & Naujok, L. (2010b). Stability analysis of autonomously controlled production networks. International Journal of Production Research, 49(16), 1-21. doi: 10.1080/00207543.2010.505215
Scholz-Reiter, B., Rekersbrink, H., & Görges, M. (2010c). Dynamic flexible flow shop problems—Scheduling heu-ristics vs. autonomous control. CIRP Annals - Manufacturing Technology, 59, 465-468. doi: 10.1016/j.cirp.2010.03.030
Scholz-Reiter, B., Görges, M., & Philipp, T. (2009). Autonomously controlled production systems - influence of autonomous control level on logistic performance. CIRP Annals - Manufacturing Technology, 58, 395-398. doi: 10.1016/j.cirp.2009.03.011
Scholz-Reiter, B., Jagalski, T., & Bendul, J. (2008a). Autonomous control of a shop floor based on bee’s foraging behaviour. In Haasis, H.-D., Kreowski, H.-J., & B. Scholz-Reiter (Eds.), Dynamics in Logistics (pp. 415-423). Berlin, Germany.: Springer. doi: 10.1007/978-3-540-76862-3_41
Scholz-Reiter, B., de Beer, C. D., Freitag, M., & Jagalski, T. (2008b). Bio-inspired and pheromone-based shop-floor control. International Journal of Computer Integrated Manufacturing, 21(2), 201-205. doi: 10.1080/09511920701607840
Scholz-Reiter, B., Böse, F., Jagalski, T., & Windt, K. (2007a). Selbststeuerung in der betrieblichen Praxis. Ein Framework zur Auswahl der passenden Selbststeuerungsstrategie. Industrie Management, 23(3), 7-10.
Scholz-Reiter, B., & Freitag, M. (2007b). Autonomous processes in assembly systems. CIRP Annals, 56(2), 712-729. doi: 10.1016/j.cirp.2007.10.002
Scholz-Reiter, B., Freitag, M., de Beer, C., & Jagalski, T. (2006). The influence of production network’s complexity on the performance of autonomous control methods. Proceedings of the 5th CIRP International Seminar on Computation in Manufacturing engineering, 317-320.
Scholz-Reiter, B., Freitag, M., de Beer, C., & Jagalski, T. (2005a). Modelling dynamics of autonomous logistic pro-cesses: Discrete-event versus continuous approaches. Annals of the CIRP, 55(1), 413-417. doi: 10.1016/S0007 8506(07)60134-6
Scholz-Reiter, B., Freitag, M., de Beer, C., & Jagalski, T. (2005b). Modelling and Analysis of Autonomous Shop Floor Control. Proceedings of 38th CIRP International Seminar on Manufacturing Systems, 16-18.
Scholz-Reiter, B., & Scharke, H. (2000). Reaktive Planung. Industrie Management, 16(2), 21-26.
Schuh, G. (Ed.). (2006). Produktionsplanung und -steuerung. Berlin, Germany: Springer.
Schuh, G., Gottschalk, S., & Höhne, T. (2007). High resolution production management. Annals of the CIRP, 56(1), 439-442. doi: 10.1016/j.cirp.2007.05.105
Siwamogsatham, T., Saygin, C. (2004). Auction-based distributed scheduling and control scheme for flexible manu-facturing systems. International Journal of Production Research, 42(3), 547-572. doi: 10.1080/00207540310001613683
Sudo, Y., & Matsuda, M. (2013). Agent based Manufacturing Simulation for Efficient Assembly Operations. Procedia CIRP, 7, 437-442. doi: 10.1016/j.procir.2013.06.012
Szelke, E., & Monostori, L. (1999). Reactive scheduling in real time production control. In Brandimarte, P. & Villa, A. (Eds.), Modeling manufacturing systems (pp. 65-113). Berlin, Germany: Springer. doi: 10.1007/978 3 662 03853-6_5
Thürer, M., Filho, M. G., & Stevenson, M. (2013). Coping with finite storage space in job shops through order release control: An assessment by simulation. International Journal of Computer Integrated Manufacturing, 26(9), 830-838. doi: 10.1080/0951192X.2013.799779
Thürer, M., Stevenson, M., Silva, C., Land, M. J., & Fredendall, L. D. (2012). Workload control and order release: A lean solution for make-to-order companies. Production and Operations Management, 21(5), 939-953. doi: 10.1111/j.1937-5956.2011.01307.x
Tsutsui, S., & Liu, L. (2007). Cunning ant system for quadratic assignment problem with local search and paralleliza-tion. In Ghosh, A., De, R.K., & Pal, S.K. (Eds.), Pattern Recognition and Machine Intelligence (pp 269-278). Berlin, Germany: Springer. doi: 10.1007/978-3-540-77046-6_33
van Brackel, T. (2009). Adaptive Steuerung flexibler Werkstattfertigungssysteme. (doctoral dissertation). Universität Paderborn, Paderborn, Germany.
Wang, L., Tang, D.-B., Gu, W.-B., Zheng, K., Yuan, W.-D., & Tang, D.-S. (2012). Pheromone-based coordination for manufacturing system control. Journal of Intelligent Manufacturing, 23, 747-757. doi: 10.1007/s10845 010 0426-z
Wang, L.-C., & Lin, S.-K. (2009). A multi-agent based agile manufacturing planning and control system. Computers & Industrial Engineering, 57(2), 620-640. doi: 10.1016/j.cie.2009.05.015
Wein, L. M. (1988). Scheduling semiconductor wafer fabrication. IEEE Transactions on Semiconductor Manufactur-ing, 1(3), 115-130. doi: 10.1109/66.4384
Wein, L. M., & Chevalier, P. B. (1992). A broader view of the job-shop scheduling problem. Management Science, 38(7), 1018-1033. doi: 10.1287/mnsc.38.7.1018
Weng, M. X., Wu, Z., Qi, G., & Zheng, L. (2008). Multi-agent-based workload control for make-to-order manufac-turing. International Journal of Production Research, 46(8), 2197-2213. doi: 10.1080/00207540600969758
Westphal, J. R. (2001). Komplexitätsmanagement in der Produktionslogistik - ein Ansatz zur flussorientierten Gestal-tung und Lenkung heterogener Produktionssysteme. Wiesbaden, Germany: Deutscher Universitäts Verlag.
Wiendahl, H.-H., von Cieminski, G., & Wiendahl, H.-P. (2005). Stumbling blocks of PPC: Towards the holistic configuration of PPC systems. Production Planning and Control, 16(7), 634-675. doi: 10.1080/09537280500249280
Wiendahl, H.-P. (Ed.). (1991). Anwendung der belastungsorientierten Auftragsfreigabe. Munich, Germany: Carl Hanser.
Wiendahl, H.-P. (1997). Fertigungsregelung. Logistische Beherrschung von Fertigungsabläufen auf Basis des Trich-termodells. Munich, Germany: Carl Hanser.
Wiendahl, H.-P. (Ed.). (2005). Betriebsorganisation für Ingenieure. Munich: Hanser.
Windt, K., Becker, T., Jeken, O., & Gelessus, A. (2010). A classification pattern for autonomous control methods in logistics. Logistics Research, 2(2), 109-120. doi: 10.1007/s12159-010-0030-9
Wong, T. N., Leung, C. W., Mak, K. L., & Fung, R. Y. K. (2006). An agent-based negotiation approach to integrate process planning and scheduling. International Journal of Production Research, 44(7), 1331-1351. doi: 10.1080/00207540500409723
Wyssusek, B. (1999). Grundlagen der Systemanalyse. In Krallmann, H., Frank, H., & Gronau, N. (Eds.), Sytemanalyse im Unternehmen (pp. 19-43). Munich, Germany: Oldenbourg.
Xiang,W., & Lee, H.P. (2008). Ant colony intelligence in multi-agent dynamic manufacturing scheduling. Engineering Applications of Artificial Intelligence, 21(1), 73-85. doi: 10.1016/j.engappai.2007.03.008
Zozom, A., Hodgson, T. J., King, R. E., Weintraub, A. J., & Cormier, D. (2003). Integrated job release and shopfloor scheduling to minimize WIP and meet due-dates. International Journal of Production Research, 41(1), 31-45. doi: 10.1080/00207540210162992
Abstract Views
Metrics powered by PLOS ALM
Cited-By (articles included in Crossref)
This journal is a Crossref Cited-by Linking member. This list shows the references that citing the article automatically, if there are. For more information about the system please visit Crossref site
1. A new method for autonomous control of complex job shops – Integrating order release, sequencing and capacity control to meet due dates
Sebastian Grundstein, Michael Freitag, Bernd Scholz-Reiter
Journal of Manufacturing Systems vol: 42 first page: 11 year: 2017
doi: 10.1016/j.jmsy.2016.10.006
This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives- 4.0 International License
Universitat Politècnica de València
e-ISSN: 2340-4876 ISSN: 2340-5317 https://doi.org/10.4995/ijpme